Sunday, October 2, 2011

Almost finished

The electric come in from a trench dug from the house.


The lift will be leveled as soon as the driveway is finished. We have 5 double 4foot florescent light fixtures, and the large 2 by 4 foot skylight. 8 inside outlets and one weather proof one on the outside.


This will be poured and finished off by the end of the week. Then, the inside floor will be covered with epoxy. When thats done, I'll assemble and install some Black & Decker cabinets, and storage units. Tool boxes, work bench, a computer desk, Satellite Radio, etc. will finish it off. Also will add shelves for items like nut and bolt cabinets, and cleaning chemicals. Last will be a landscaper to clean up and make everything look nice.

No comments:

Post a Comment