Kingman Garage Project
Saturday, April 21, 2012
Tuesday, November 8, 2011
Stowing has started
Just counted, I have 22 boxes left to unpack and put away in the garages. |
Took time to wax the Harley today. Probably will put the cover on it tomorrow. I'll be using the Burgman and the Dual Sport this Winter. |
The corner behind the bike will be the "lube" center. Nothing in here is finished, The boxes aren't organized, so I have to keep adding to different places as I unpack them. |
Added a few old decorations, probably will have all the walls full when finished. |
Thursday, November 3, 2011
98% Finished. Last Pictures
Will be working out here until we leave for Yuma |
All the items won't be stored, I have several boxes full of flea market items already, and there will be more |
By this time next year, it will be all in working order |
The difficult construction is over, now it's just finishing some things and getting stuff put away where I'll remember where it is :-) |
Front of the house garage. Just have to add tools to the peg board, put up some shelves on a side wall, add a few more decorations, and it will be finished. |
First test to get in both vehilces. Now to get the storage cabinets organized, put up a peg board, and fill the tool box up (box is a Craftsman bench with drawers in front of the pickup. |
Last coat of gypsum before installing the cabinets |
"Dennis" was hired to help with the drywall and getting the cabinets in. We worked pretty hard all day on it. Pat came out for an inspection. |
Found this small cabinet in a thrift shop, but it didn't have a top, So, cut down an extra shelf and glued it on. The bike jack is holding it down until morning for the liquid nails to cure. |
This one sort of fell apart went we loaded it on the trailer to get it here. It's almost back together again. |
Rolled in the tool box and large work bench. |
Will put another stackable set of shelved on the taupe colored cabinet. That will hold lube oil and filters. |
Not a lot of room, but enough |
I'll add one more after the shelves and peg board is up, but for now, this is "The End" |
Tuesday, November 1, 2011
Only 3 more days!
Now that the floor is hard, the insulation went in today on the walls. Sheet rock is 1/3 done. Tomorrow the rest of the sheet rock will go up, and be fire taped. Some interior trim will be added too. |
Dennis owned a Bar and Restaurant for 20 years, but is now back to construction. He's fast and doesn't charge as much as some. And, he's doing a good job. |
Saturday, October 22, 2011
ALMOST finished!
Bikers Against Droopy Drawers would have a problem with the pants :-) But, he's really a nice guy and hard worker. The last day of the floor is finished. |
Hauling 6 used cabinets, staging them in the house garage. Hired Marcus to help today, put in 7 hard hours, but we got a lot moved, and some other things out of storage |
We won't be able to park in the garage for about a week now |
Pat found our first Scorpion! It was in Scorpion heaven, probably from the stuff the exterminator sprayed a couple days ago. It was outside on the patio. Hopefully we won't see any "live" ones! |
Very thick epoxy, and a nice coat of color chips |
Ready to wrap it up of Sunday. Monday they will be back to put on 2 clear coats |
Julie and her friend (thanks, Ronda) are enjoying the NASCAR race while I've been out checking the garage progress. I can join them now. |
Special footware for walking on the fresh epoxy. He's mixing the catalyst with the epoxy now, getting ready for the second coat. |
Sunday morning, the crew is here for another coat. |
Hard to believe it's even going to be better than this! |
Adding the chips. White, black, and gray. |
Adding epoxy and chips. |
Pat's brother, Richard, pulled this camp trailer down with his Goldwing. He isn't feeling well, so don't know how much riding we'll be doing as planned. |
The sky is about the same color as the floor. The floor guy taped the doors for just the right amount of ventilation, but enough to keep dust and bugs out tonight. |